[Steam-engine] boiler feedwater injector conection
Richard Strobel
Richard_Strobel7 at msn.com
Tue Nov 8 05:10:24 PST 2005
>
> As far as a feed water line into the vertical boiler under
> discussion, I would not run it into the bottom as it would stir up
> the sludge as water is put in. I would run it into the top of the
> boiler,
Blake see below..how would I install a pipe inside a boiler?
but I would put a pipe inside the boiler to a point well
> below the water level, but not too close to the tube sheet.
Thanx
RickinMt.
More information about the AT
mailing list