[AT] OT - bridge replacement
Herb Metz
metz-h.b at comcast.net
Wed Feb 27 19:51:41 PST 2013
Something very similar to Spencers black road paper is black, 3' tall
plastic silt fence which is installed in a vertical position around most
construction sites to stop the flow of silt soil but allows the water to
slowly flow through the close plastic mesh. This is normally removed once
grass, etc is growing enough to prevent soil erosion from previously graded
soil. Contact the subs who installed the fence, then be there when they
remove it and they will probably load it onto your trailer. Our garden is
normally planted on 38" rows; very few weeds will grow with this as a
horizontal carpet; it also reduces evaporation from moist soil, and one can
walk through the garden soon after rain without getting shoes muddy.
Soil, then one or two layers of silt fence, then one or to layers of rock.
On the pipe diameter, I would be inclined to go at least one size larger
than what is expected to be adequate.
-----Original Message-----
From: Spencer Yost
Sent: Wednesday, February 27, 2013 9:55 PM
To: Antique tractor email discussion group
Subject: Re: [AT] OT - bridge replacement
I might suggest you backfill to grade with dirt, then put the gravel on
"road paper" (I doubt that is the right name) to keep the gravel from
disappearing into the dirt. It looks a lot like the back paper you might
use use strawberry rows or gardens but is heavier. I can usually get it
pretty reasonably priced. I spent 300 for a big roll the last time that
probably had 100 yards on it. So about a buck a foot 10 years ago. Keeps
most of the weeds out too(not sure that matters for a tote path though).
Even if you backfill entirely with gravel this might help some with gravel
migration.
Hope that helps,
Spencer
Sent from my iPhone
On Feb 26, 2013, at 23:35, Mike <meulenms at gmx.com> wrote:
> Our property is divided in two by a drainage ditch that is only full
> after a rain, and in the spring/early summer. There is one bridge across
> that is made from wood, and it is starting to fail. I use the bridge
> quite a bit to bring firewood up to the house with my MF 255 w/ FEL. I
> can see the wood is rotting and it is starting to sag as I go over it,
> coupled with the fact that it only leaves me about 6" to spare on either
> side, it has to go. I would like to just remove it, and replace it with
> a 12"or 14" drain pipe covered with "gravel". Any ideas on what type of
> stone or gravel I should use so that it will stay stable and not turn to
> soup in the spring? Thanks, Mike
More information about the AT
mailing list