[AT] Machinery storage update - LONG
charlie hill
chill8 at suddenlink.net
Thu Oct 11 05:21:35 PDT 2007
Hi Greg,
A friend of mine bought a Morton building about 15 years ago. It looks just
as good today as it did the day they finished it. He's very happy with it.
I think you made a wize decision. Congratulations.
Charlie
----- Original Message -----
From: "Greg Hass" <gkhass at avci.net>
To: <at at lists.antique-tractor.com>
Sent: Wednesday, October 10, 2007 5:24 PM
Subject: [AT] Machinery storage update - LONG
> A couple of months ago, I posed the question to the list of how to store
> some of my machinery, mainly my combines. I received several useful
> replies, for which I thank the members of this list who took the time to
> share their opinions and experiences. The first thing I considered was
> tarping the equipment which I quickly decided was not the answer in my
> case
> due to the size and amount of equipment and the fact that we are in a high
> wind area.
>
> I then turned my attention to a more permanent solution. The first thing
> I
> did (as someone on the list suggested) was to contact Morton buildings.
> The
> salesman took me to a place about 5 miles from me where they had just
> completed a new building and in our discussion he told me that the
> smallest
> building they offered in a 14 foot height (which I need for the combines)
> was 40 ft. x 60 ft., which was bigger than I had planned on. He also said
> they had a sale on their new line of "Country Craft" buildings which are
> about 20% cheaper and built a little lighter than their other
> buildings. We were about a far north as they could build this line due to
> snow load. When I asked the price, it was $19, 401...at which time I had
> to excuse myself for a quick trip to the necessary.
>
> On to Plan B........ We then contacted to local contractors of good
> reputation to price a building 32 ft. x 48 ft. x 14 ft. tall that woul
> have
> 2 ends and one side, with the east side being completely open. (As some
> may remember from my first post, I am now storing one combine in a shed
> just like that at what was my dad's place. However, since he died, my
> younger brother inherited that farm and he is sytematically booting my
> equipment out in favor of storing his own equipment, much of which is
> unaffected by the weather. I have already had 2 combines out in the
> weather form over a year and they were not taking it very well.) About 2
> weeks later I received the bids from the private contractors and again had
> to head for the necessary. As it turned out, both contractors were within
> $18 of each other in price at $13, 482 +/- . I then sat down at the
> calculator and figured that the open front building was gong to cost me
> $1.25/sq. ft. MORE than the Morton building, although total cost would be
> less due to smaller size. And that was with NO doors and only 1 long wall
> and 2 short ends. I then started thinking that, although the Morton
> building was bigger than what I had planned, for $6000 I would gain 1000
> sq. ft. plus the building would have 4 walls with a 20 ft. sliding door
> and
> a walk-in door.
> After talking with our friendly banker and with several friends, the
> decision of which building to build became a no-brainer.
>
> The Morton building was delivered this afternoon and I was told they are
> scheduled to start Monday morning. The building should be completed by
> mid-day Wednesday of next week. The only unexpected thing was that even
> though we live on top of a gravel hill, we determined that the far end of
> the building was 11 inches lower than front end, I had to have 150 yards
> of
> fill hauled in and level it.
> (Tractor reference: I used my IH Cub with mid-mount blade to level the
> fill and shape the grade.)
>
> Will post later after it's done and let you know how things turned out.
>
> Greg Hass
> Michigan's Thumb
>
> _______________________________________________
> AT mailing list
> http://www.antique-tractor.com/mailman/listinfo/at
>
>
> --
> No virus found in this incoming message.
> Checked by AVG Free Edition.
> Version: 7.5.488 / Virus Database: 269.14.6/1060 - Release Date: 10/9/2007
> 4:43 PM
>
>
More information about the AT
mailing list