[AT] grounds
carl gogol
cgogol at twcny.rr.com
Tue Dec 18 17:20:05 PST 2007
I haven't seen anyone mention this yet, but the current practice connection
to subpanels is 4 wire. When my barn was wired about 5 years ago, the
original feed from the power-line to the first panel box is three wire and
a two rod ground network just outside of the house is connected in the panel
box.. The feed from there to the subpanel in the basement is 4 wire (two
hot, a neutral and one connected to the ground network). Then the added
feed from that subpanel (and any subsequent subpanel) is also 4 wire. Maybe
this is the reason additional attachments to earth ground at subpanels are
not desired / required.
Carl Gogol
Manlius, NY
AC One Seventy diesel
(2) AC D-14, AC 914H
Simplicity 3112 & 7116
Kubota F-2400
More information about the AT
mailing list