>Karl assembled the large corrugations in a short time, with assists
>from Richard Walker and Don Bowen (both on this list), and maybe others.
Not exactly short, Herb - assembly took over two months, not counting
the pouring of the slab.
Unfortunately Karl's concrete contractor messed up on the dimensions
and poured the slab a tad oversize, which screwed up the designed
intended drainage of the footer plates and panels for overlapping the
slab. Karl slathered caulk around things to fix this.
I was up in Ridegecrest helping Karl three weekends myself, with the
aid of some conscripted help from various friends. We would
preassemble each three-piece arch and then use Karl''s forklift,
outfitted with a homemade platform, to lift each arch into
place. Then we would use the platform as a mobile scaffold for
bolting the sections together. One person would be above on the
platform with the impact wrench, and one below on a ladder with an
end wrench. About 10% of the bolt holes would not line up with a
drift and we had to drill them out to stick the bolts in. On a good
day, we could get 4 or 5 sections assembled and installed. And
contrary to what some of you who may know us are no doubt wondering,
we worked hard straight through and the beer drinking did NOT start
until after quitting!
Everyone involved agreed that if we had NOT had the luxury of a
forklift, it would have taken at least four or five workers to
manually lift, jockey into position and bolt the sectional arches together.
3 photos of Karl's shed under construction:
http://users.adelphia.net/~rick427/tractors/karlshed02.jpg
http://users.adelphia.net/~rick427/tractors/MVC-667F.JPG
http://users.adelphia.net/~rick427/tractors/1.jpg
- Richard
Richard & Judy Walker
Monrovia, CA
richardwalker @ pobox.com
judywalker @ pobox.com
delete spaces to use addresses
More information about the AT
mailing list