[Steam-engine] boiler feedwater injector conection
Eric Applegate
eric at glassactonline.com
Sat Nov 5 17:25:19 PST 2005
Wow boys that was close. 80 HP fire is a good size fire in my book. Don't you wish you would have found that fitting before you built the fire?
Eric
---------- Original Message ----------------------------------
From: CopperheadMarine at aol.com
Reply-To: Steam-engine mailing list <steam-engine at lists.stationary-engine.com>
Date: Sat, 5 Nov 2005 19:02:11 EST
>I guess Eric you cant be scared to pull a fire. I have pulled more than one
>in my career. Pulled one once in a 80 HP Erie City boiler on the Fourth of
>July. It had just been loaded up with 4 foot slab wood and I notice a fitting on
>the injector feed about to fracture completely! It about gave two of us a
>heat stroke getting the fire out of the boiler and hosed down.
>
> Later after the boiler was cool, as soon as the pipe wrench was applied
>the fitting broke off with just the weight of the wrench. The next project was
>to re plumb the boiler with sch 80 piping.
>
> Had a handhole gasket blow out once, even an injector get plugged.
>
>Charlie
>_______________________________________________
>Steam-engine mailing list
>http://www.stationary-engine.com/mailman/listinfo/steam-engine
>
--
Thanks,
Eric Applegate
--
More information about the AT
mailing list