[AJD] Putting the D together

greg at theoldtractorcompany.com greg at theoldtractorcompany.com
Sun Feb 13 18:02:09 PST 2005


I always used the specified torque
I use CopperKote on the gasket, put the smooth side to the block and don't forget TWO lead 
washers on each stud on the D
Greg

Greg Stephen
The Old Tractor Company
Stephen Equipment Company
PO Box 709
Franktown, CO 80116
303-663-5246
303-468-0377 FAX<<--GREAT WAY TO REACH ME!

On Sun Feb 13 19:04 , Gary Epps <garyepps at fidnet.com> sent:

>I have been advised to torque the head bolts on the D to as much as 20 
>ft lbs over spec.  This would take it from 208 ft lbs to as much as 
>nearly 230 ft lbs.  What numbers do you use?  Do you torque over spec? 
>Is 208 ft lbs enough torque?  It is a beefy engine.
>
>Gary
>-- 
>In the Ozark Mountains of South Central USA where both life and I move 
>at a leisurely pace.
>
>_______________________________________________
>Antique-johndeere mailing list
>http://www.antique-tractor.com/mailman/listinfo/antique-johndeere






More information about the AT mailing list